First floor at Pulse with ceiling grid placed and floor leveled, Almere

Pulse: the first floor takes another step forward

The ceiling grid is placed and the floor is leveled on Pulse's first floor. Lighting preparations are underway, with ventilation grilles next in line.

Work on the first floor of Pulse is moving forward again. The ceiling grid is in place, and the floor has been leveled. In parallel, preparations for the lighting are already underway.

  • Ceiling grid placed across the floor
  • Floor leveled
  • Preparations made for the lighting

The next phase is already lined up: lighting and the ventilation grilles, continuing the same sequence we've followed on the floors below.

Finished walls and windows on the first floor at Pulse Materials being organized on the first floor at Pulse
Walls finished, materials staged for the next phase.

What's next

Lighting and ventilation grilles are up next, continuing the sequence floor by floor. 4,250 sqm across six floors, 109 parking spaces on site, and Pulse keeps closing in on delivery.

Keep reading

Field notes from the next cycle. Deal mechanics, exit discipline, and what I'm buying next. One email when a new piece goes live. No spam.

Raoul Böhne

Have a question?

Working on a deal, thinking about a strategy, or want to run something past me? Send a note. I read everything that comes in and reply to the ones I can answer.

Goes straight to my inbox. I reply personally. No newsletter signup, no automated funnels.